Pergola Contruction Update

Update on the Pergola construction (16/12/2023)

Wall elements assembly started.

Update on the Pergola construction (9/12/2023)

The walls for the storage compartment, behind the stage, have been delivered. See photos below.
The club is finalizing selection of the stage floor covering.
More details soon.

 

August 2023: Work progress on the Pergola construction site

At the Polish Center in Albion, an event center is being built, tentatively called a pergola. The structure of the pergola will consist of a concrete base measuring 12 x 24 m, on which the wooden floor of the stage will be placed. The supports and roof structure will be made of steel elements, and the roof will be covered with Lysaght panels.

The structure is being built thanks to the funding received by the club from the local authorities.

Construction work progresses well and currently the roof panels and isolation are being installed. The next stage will involve installation of the ceiling to prevent birds from “claiming” the under roof space.

The contractor for the steel structure elements is SGA Engineering from Melton.

Price negotiations are underway with various subcontractors and suppliers (electricians, plumbers, painters, etc.) whose employment will be necessary for the finishing works.

If the construction does not encounter any unexpected delays, the new facility will be ready for use in just two months.